Mini E&C
Mini E&C Mini E&C Mini E&C

CEREMONY CEREMONY OF GOLD COAST PROJECT IN NHA TRANG

On the morning of January 19, 2019 at GOLD COAST Nha Trang project held a ceremony topping out the building. Complete the last batch of concrete for the roof of the building.

Compared to the original plan when MINI joined the project, the progress has exceeded 30 days.
Together with representatives of  NAGECCO and investor THANH YEN.
MINI ENC organized a roof-topping ceremony to mark a major turning point in the project construction phase.


At this project, MINI participates as a contractor in structure and construction of cars. Besides, it helps the investor to devise the most effective construction measures to prevent the progress and complete the project at the absolute safest level.


After more than 8 months of continuous construction and progress, quality and safety, the investor was very satisfied with the performance. In addition, the Owner highly appreciated the consultancy, construction measures, risk solutions proposed by Steering committee and applied during the construction process, which helped the project to be completed. excellent way.

Copyright © Mini E&C 2018